Skip to content

Investment in Ukraine

Bankfähige Solar- und Speicherprojekte in der Ukraine: ROI ab 2,7 Jahren, 25–30 % mehr Ertrag und 60–80 % niedrigere Baukosten.

Investment in Ukraine — How International Capital Earns Secure Returns in Solar

Rarely have growth potential and contractual security sat so close together as in an investment in Ukraine. The country combines the return profile of an emerging market, the demand of a historic reconstruction, and a regulated power sector now synchronised with the EU grid. SolarGarden, a Ukrainian solar developer and EPC contractor, guides Polish and international investors into this market safely — from site selection to decades of operation.

Southern Ukraine (project region)1350 kWh/kWp
Germany1040 kWh/kWp
Annual output in Ukraine
13.5 GWh
Same plant in Germany
10.4 GWh
Energy advantage
+30%
The same capital generates 3060 MWh more clean energy per year in southern Ukraine than in Germany — extra revenue from the first year of operation.

Specific yield (PVOUT) — long-term averages from Global Solar Atlas / PVGIS for optimally tilted PV. Indicative; final yield depends on site, tilt and technology.

Request the financial model →

Why invest in Ukraine now?

  • Bankable and secured: confirmed bank financing, 49-year leases, verified land rights, political/war-risk cover via international institutions.
  • Predictable returns: commercial ROI from 2.7 years, contracted revenue.
  • Reconstruction as a structural driver: grid modernisation creates sustained demand for generation and storage.
  • On the EU border: grid synchronised with the EU (ENTSO-E) since 2022 — electricity export possible; for Polish capital, a neighbouring market with shared logistics.

The triple advantage of an investment in Ukraine

1. More energy (+25–32%)

~1,350 kWh/kWp in southern Ukraine vs ~1,020 in Poland and ~1,040 in Germany.

2. Lower construction cost

EPC labour ~€15/h vs €24 in Poland and €45–90 in Western Europe — lower capex per MW.

Ukraine — contractor rate€15/h
Germany — contractor rate€55/h
Labour cost in Ukraine
€0.53M
Same work in Germany
€1.93M
You save
€1.40M
Building this project in Ukraine cuts contractor labour cost by 73% versus Germany — lower capex per MW and stronger project returns.

Hourly rates are indicative fully-loaded EPC/installation labour; labour-hours per MW vary by site and mounting type. Adjust the sliders to your assumptions.

Request the full cost breakdown →

3. Expensive energy displaced

Diesel back-up runs at ~€0.30–0.45/kWh in Ukraine; solar-plus-storage replaces it permanently, driving fast payback.

Lever Poland / W. Europe Ukraine Effect
Yield ~1,020–1,130 kWh/kWp ~1,350 kWh/kWp +25–32% revenue/MW
Labour €24–90/h ~€15/h lower capex/MW
Displaced energy ~€0.10–0.25/kWh ~€0.30–0.45/kWh faster payback

How your investment works

  1. Project selection from a concrete portfolio with full financial models
  2. Due diligence — land, permits, grid, legal structure verified
  3. Fixed-price EPC delivery — guaranteed budget and timeline
  4. Operation and reporting — O&M, monitoring, transparent EUR/UAH reports

Legislative incentives that protect your capital

(verify with legal counsel)

  • “Investment nanny”: state support for large investments — dedicated manager, VAT/customs exemptions, tax relief [threshold to verify].
  • Exemptions on imported equipment [list to verify].
  • Guaranteed off-take (green tariff / premium / CfD) [model to verify].
  • 49-year leases secured (Odessa/Cherkasy).
  • Political- & war-risk cover via MIGA, DFC, ECAs.

💡 “Ukraine doesn’t just permit foreign energy investment — it underwrites it: tax and customs relief, guaranteed off-take, EU grid access and political-risk insurance turn a high-yield market into a structured, bankable one.”

Live projects with international investors

Bank financing confirmed, fund talks underway: 10 MW storage plant, three PV+storage sites in Izmail (Odessa), PV+storage in Cherkasy (5 months), BESS plant planned. Investment projects.

Frequently asked questions

Is it safe to invest in Ukraine now? SolarGarden structures every investment with verified land rights, insurance and bankable contracts; political/war-risk cover from international institutions is available.

What returns can I expect? Commercial solar projects target ROI from 2.7 years, secured by long-term electricity contracts.

Can foreigners own energy assets? Yes — foreign investment in energy is permitted and protected; SolarGarden handles full legal structuring.

Can electricity be exported to the EU? Yes, thanks to EU grid synchronisation (ENTSO-E) since 2022.

CTA: Request an investment proposal →


Next: 03–08 (EPC, contractor, construction, commercial, storage, business).

Investment-Exposé anfordern

Erhalten Sie Portfolio, Finanzmodell und nächste Schritte für Solar- und Speicherinvestitionen in der Ukraine.